Page not found

Search results

  1. City Commission Meeting

    City Commission | Calendar Event | 06/16/21 06:00pm

    LICENSE(S) – (New) – (R. Monday) 1. Consider Approval New Alcohol Beverage License: Name of Business ... stormwater equipment along with a Community Development Block Grant Manager position. Following ...

  2. City Commission Meeting

    City Commission | Page | 08/01/18 07:00pm

    regarding Stormwater Utility; stating same was not being advertised as a tax. UPDATE(S) 1. Downtown ... HEARING 2. Stormwater Utility Ordinance. (B. Corry) City Attorney Corry gave an overview of the ... Delaney, 15 Dunbar Creek Point, St. Simons Island, stated the stormwater utility is a tax increase and ...

  3. ***Important Notice About Your Property Tax Assessment***

    Tax Department | News/Press Release, Alert | May 30, 2023

    Taxable x 13.219 / 1000 = Estimated City Tax Note also that stormwater fees were not included in the ... assessment notice. Per Municipal Code §22A-114 and §22A-115, Stormwater fees are billed to any parcel in the ... a stormwater fee of 1 ERU, resulting in a stormwater fee of $54 on their property taxes.   If you have any ...

  4. City Commission Meeting

    City Commission | Calendar Event | 11/17/21 06:00pm

    annual real property tax bills levied on the parcel(s): 8. Construction Type (New Construction, Rehab, ... in Georgia Redevelopment Powers Law (O.C.G.A 36-44-3(5)). These eligible purposes/uses include:  New ...

  5. City Commission Special Called Meeting

    City Commission | Page | 06/27/18 07:00pm

    Discuss Proposed Stormwater Utility Ordinance. (B. Corry)(G. Alberson) City Engineer Alberson introduced ... questions the commission might have for the Planning Group regarding the stormwater utility rate study. City ... Engineer Garrow Alberson gave a detailed overview of the stormwater utility rate study and the ...

  6. City Commission Meeting

    City Commission | Page | 02/20/19 07:00pm

    Brunswick Stormwater Utility Credit Manual to Provide an Additional Time Period for the Submission of an ... Application for a Credit to be Applied to the 2019 Stormwater Utility Fee; seconded by Mayor Pro Tem Williams. ... City of Brunswick Stormwater Utility Credit Manual to Provide an Additional Time Period for the ...

  7. Downtown Master Plan

    Downtown Development Authority | Page

    pe- destrian accommodations. After: With refurbished façades, new plantings, string lighting, and ... landscaping to welcome visitors and provide shade. In addition to a new shaded median along Bay Street, ... activity. Mirroring the look of the new gateway at US 17 and Gloucester, new signage imparts a sense of ...

  8. Rethinking Run Off Plan

    Public Works | Page

    stormwater green infrastructure practices that provide opportunities to reduce pollution. This Plan outlines ... practice type and size, volume of stormwater treated, and estimated costs. It provides fundamental ...

  9. Zoning Ordinance Amendments

    Ordinances

    connected by a firewall or is separated by a load bearing wall is considered “new construction”. Alley: ... quarters for the conduct of a business, profession, trade or occupation, new or used goods, products or ... shall continue to be a part of this zoning ordinance until such time that a new and updated map of the ...

  10. City Commission Meeting

    City Commission | Calendar Event | 11/04/20 06:00pm

    Mayor Harvey announced no action was taken. DISCUSSION(S) 1. Revision to Stormwater Management ... unanimously by a vote of 5 to 0. 5. Consider Approval of Budget Adjustment – Adding of Stormwater Utility ...

Pages